XDR — Engineered for Safety
Fastest workover rig on the planet · API 4F · Established 2007

The fastest workover rigs on the planet.

30-minute rig-up. 80 m/min trip speed. Autonomous levelling. Patented freestanding mast — no guy lines. SIL-2 Xenon OS. Designed, manufactured and supported by XDR for operators who measure success in NPT, not just rate.

30 min
Mast rig-up · no guy lines · fastest in class
80 m/min
Drawworks trip speed · variable hydraulic
API 4F
Licensed structural manufacturing · SIL 2 controls
1ˢᵗ
Electric workover rig sold into Europe
Xenon OS

One operating system for the whole site.

The PLC-driven, SIL 2-rated platform at the core of every third-generation XDR rig. ISO/IEC 23270 compliant. Fully scalable, fully customisable, fully telemetric.

  • Stream every plant parameter — anywhere in the world.
  • One operator, one cabin: rig, catwalk, magazines.
  • Auto-monitoring of wear, fluids and service intervals.
  • Black-box logging for every operation.
Xenon OS — live plant telemetry dashboard
IntelliBeam™ · Patented

Rollover risk, visible before it’s hazardous.

XDR's patented stability system. Load-sensing pads beneath every rear jack leg measure compressive ground force in real time. The PLC computes lateral centre-of-gravity and displays it on the HMI so operators see rollover risk developing — long before it becomes hazardous.

  • Continuous lateral COG tracking on a live stability slider.
  • Normal · Caution · Stop — colour-coded thresholds with audible warnings.
  • Detects accelerating COG shifts as a leading indicator of subsidence.
  • Auto pull-back: PLC engages slips and stops the drawworks at threshold.
IntelliBeam HMI — live stability monitoring with COG indicator
XDR rig manufacturing
Heritage

Engineered in Australia.
Built worldwide.

XDR has spent nearly two decades engineering rigs that prove themselves on the toughest onshore wells — manufactured to API 4F at our HYDCO facility in India and deployed across operators worldwide.

2007

XDR founded in Australia. HYDCO Engineering established the same year as XDR’s wholly-owned Indian manufacturing operation.

2010s

Patented freestanding mast — 30-minute rig-up, no guy lines. The fastest workover-rig rig-up on the market. Manufactured to API Spec 4F under the API Monogram Program.

Recent

Autonomous levelling, 80 m/min variable-hydraulic drawworks trip speed, and the first electric workover rig with battery regeneration sold into the European onshore market.

Talk to us

Ready for a rig that’s supported as well as it’s built?

Tell us about the wells you service. We'll come back with a configuration, lead time and a service plan.